J. Henry Higgins Middle School
/Agostini Bacon Joint Venture is excited to announce that they have been awarded the contract on the new J. Henry Higgins Middle School in Peabody, MA.
Read MoreAgostini Bacon Joint Venture is excited to announce that they have been awarded the contract on the new J. Henry Higgins Middle School in Peabody, MA.
Read MoreThe Greater New Bedford Regional Vocational Technical High School recently added two new additions to the existing 460,766SF high school. Block K is a 16,682SF three-story classroom wing constructed of structural steel, masonry veneer and architectural precast panels.
Read MoreThe new Somerset Berkley Regional High School in Somerset, MA, is a 222,826SF masonry and steel building. The new school consists of a 3-story classroom wing, a new gymnasium with an elevated running track, an adjoining fitness area, an auditorium, a cafeteria, a media center and a large group lecture hall.
Read MoreThe construction of the New Franklin High School, a 306,543 SF state of the art facility with a masonry façade and light gauge framing back-up, consists of a three story classroom wing, a single story gymnasium with an elevated running track, adjoining fitness area, an auditorium, cafeteria, media center and a large group lecture hall.
Read MoreThe new facility for the Rhode Island School for the Deaf provides 61,100 SF of new academic space to replace the former school at Corliss Park in Providence and included renovating the existing 12,400 SF gymnasium.
Read MoreThe Danvers High School underwent renovations of approx. 157,000SF of the existing facility and demolition of selected areas. A new 92,000SF addition was added to the existing facility.
Read MoreThe new elementary school is a 103,000SF facility consisting of a lower school and upper school. The two wings are joined together by a centrally located administration area, cafeterium and gymnasium.
Read MoreThe new two-story 119,000SF middle school consists of a common core space which houses the 250 seat cafetorium, media center, gymnasium and administration offices.
Read MoreThe town of Rockland recently renovated their existing 162,000SF high school and added a 110,000SF addition for the new John Rogers Middle School. The project included the complete “gut-renovation” of the existing high school while it was occupied in five separate phases.
Read MoreThe new 53,000SF addition recently completed at the Foxborough Regional Charter School consists of a two-story building, which provides the school with twenty seven new classrooms, a new administrative and programming area and a new double gymnasium.
Read MoreThe project consisted of various renovation phases to the existing 496,503 SF three story high school and middle school building and a new 62,365 SF three story middle school addition.
Read MoreOnce again Agostini Construction Company is partnering with Ai3 Architects to build the Norwood High School. The building consists of shallow concrete foundation, steel structure, composite metal/concrete decks, exterior CFMF with masonry veneer skin.
Read MoreThe two new 116,435SF identical twin elementary schools built for the city of Brockton each include a three story classroom wing and a two story section with new kitchen, receiving and mechanical areas.
Read MoreThe town of Milton completed a renovation of the historic 57,000SF Cunningham Elementary School along with an 86,000SF addition for the Collicot Wing.
Read MoreThe new 340,000SF high school, designed to accommodate 2,000 students plus staff, consists of a three story classroom structure and a two story wing housing the administration area, library/media center, cafeteria, auditorium, fine arts and performing arts.
Read MoreThe City of Providence renovated the formerly vacant Nathan Bishop Middle School, a historically significant Georgian Revival style building on the east side of Providence. A complete rehab of the building included abatement, demolition, building envelope work and interior fit-up.
Read MoreThe new facility is a 134,318 SF middle school housing 1000 students from grade 6 to 8. The exterior façade is masonry with GRF accents. The interior of the building includes new teaching facilities, a full size gymnasium and a 400 seat auditorium.
Read MoreThe Whitman Hanson Regional School District's new 234,500SF high school is constructed of structural steel framing with a masonry veneer skin. There is a 3-Story classroom wing, 850-person auditorium, double gymnasium with elevated running track complete with locker rooms, and a cafeteria with a full commercial kitchen.
Read MoreSave the Bay, Inc is an independent, not-for-profit organization that constructed a new 15,042SF environmentally sustainable educational center at Fields Point.
Read More