Fiske & Schofield Elementary School Renovations

The Fiske and Schofield Elementary Schools are scheduled to undergo extensive renovations over an eight-week period during summer vacation. Renovations include upgrades to the HVAC System, fire protection upgrades, plumbing, fire alarm, security, electrical and interior fit-up. 

Read More

Greater New Bedford Regional Vocational Technical High School – Addition Block K & L and Renovations to the existing Bldg.

The Greater New Bedford Regional Vocational Technical High School recently added two new additions to the existing 460,766SF high school. Block K is a 16,682SF three-story classroom wing constructed of structural steel, masonry veneer and architectural precast panels.

Read More

Somerset Berkley Regional High School

The new Somerset Berkley Regional High School in Somerset, MA, is a 222,826SF masonry and steel building. The new school consists of a 3-story classroom wing, a new gymnasium with an elevated running track, an adjoining fitness area, an auditorium, a cafeteria, a media center and a large group lecture hall. 

Read More

Franklin High School

Franklin High School

The construction of the New Franklin High School, a 306,543 SF state of the art facility with a masonry façade and light gauge framing back-up, consists of a three story classroom wing, a single story gymnasium with an elevated running track, adjoining fitness area, an auditorium, cafeteria, media center and a large group lecture hall.

Read More

Foxborough Regional Charter School

The new 53,000SF addition recently completed at the Foxborough Regional Charter School consists of a two-story building, which provides the school with twenty seven new classrooms, a new administrative and programming area and a new double gymnasium.

Read More